Road 3 Closure : Bridge rehabilitation on Highway 3 is planned from August 15 to September 30, 2022 between the Pimbina-Saint-Donat and Assumption sectors. You will therefore have to go to your accommodation or campsite through the main entrance of the Assumption sector.
Use the search mode of your choice to navigate to the desired site. To learn the availability of sites, you must specify your dates of stay.
Map
Legend
- Registration center
- Washroom
- Outhouse
- Shower
- Water Supply point
- Parking
- Supervised beach
- Playground
- Accessible for the mobility impaired
- Moderate conversation allowed after curfew
- Dogs allowed
- Dogs not allowed
- Inaccessible by vehicle
- Route
- Pedestrian access
- Number of guests
- Number of rooms
- Number of beds
- Offered
- Available
- Partial availability
- Not available or closed
- Does not match your search criteria
- Already in cart